Gymnastics Foam Pit
February 2024Notts Gym Academy
Project Description
Removal of thick bituminous paint and adhered foam padding from dense blockwork and RC slab after severe flooding. Surface prepared for specialist waterproofing membrane application.
Challenge
Storm Babet flooding caused £10,000s in damage. Required complete removal of bitumen and foam to prepare for waterproofing.
"Just wanted to put on record and thank you and the lads for doing a great job. All the lads were a credit to yourself and your company, very professional and amenable and very considerate with regards to the site and the complexities of the Gymnasts and the School environment."
— Bobby Oldham
Sidown Hill Water Storage Reservoir
September 2024J Browne Construction for Southern Water
Newbury RG20 9QE
Project Description
Removal of deteriorating coatings and surface rust from potable water storage tank, both internally and externally. RC base scarification and contaminant removal.
Challenge
Remote forest location, potable water tank requiring meticulous preparation for long-term protection.
Achievement
Steel surface left in perfect condition to receive primers and coatings. Confined space certified operatives (City & Guilds L2) ensured complete safety.